Brownsburg Christian
Church |
Completion
Date:
June 2005
Duration:
11 months
Work Performed
by Brandt Construction, Inc.: 25%
Project
Manager:
Chirag Patel
Owner:
Brownsburg Christian Church
Project Architect:
Arc Design
Mechanical Engineer:
Vector Consulting
Civil Engineer:
Context Design
Structural Engineer:
Lynch, Harrison & Brumleve
References:
Sherry Perkins
Brownsburg Christian Church
(317) 852-2221
Andy Hine
Arc Design
(317) 951-9192
|
|
In
March of 2004, Brownsburg Christian Church sought out Brandt Construction,
Inc., based on our reputation, to serve as the Design/Builder
and General Contractor on a 32,423 SF addition to their church.
The project includes the addition of a new two-court gymnasium,
foyer, chapel, kitchen, bride area, and support space, as well
as extensive site work. This project was completed in June of
2005.
Features:
- New chapel to be used for small weddings and other events.
- A gymnasium that houses two full basketball courts.
- Several fellowship rooms.
- Glass Atrium that connects addition to existing building.
|
|
|
©