"Our mission is to produce quality construction, at an economical price, within a reasonable time frame. Customer satisfaction is our number one goal and is paramount to our continued success. We achieve this goal by employing highly trained managers and skilled tradesmen and by executing our work with the highest degree of professionalism and integrity."

 
Brownsburg Christian Church

 

Completion Date:
June 2005

Duration:
11 months

Work Performed by Brandt Construction, Inc.:  25%

Project Manager:
Chirag Patel


Owner:
Brownsburg Christian Church

Project Architect:
Arc Design

Mechanical Engineer:
Vector Consulting

Civil Engineer:
Context Design

Structural Engineer:
Lynch, Harrison & Brumleve

References:
Sherry Perkins
Brownsburg Christian Church
(317) 852-2221

Andy Hine
Arc Design
(317) 951-9192

In March of 2004, Brownsburg Christian Church sought out Brandt Construction, Inc., based on our reputation, to serve as the Design/Builder and General Contractor on a 32,423 SF addition to their church. The project includes the addition of a new two-court gymnasium, foyer, chapel, kitchen, bride area, and support space, as well as extensive site work. This project was completed in June of 2005.

 

 

Features:

  • New chapel to be used for small weddings and other events.
  • A gymnasium that houses two full basketball courts.
  • Several fellowship rooms.
  • Classroom space.
  • Glass Atrium that connects addition to existing building.