Christ Church Cathedral—1989 |
Completion
Date:
1990
Duration:
10 months
Work Performed
by Brandt Construction, Inc.: 20%
Project
Manager:
Harold Sattison
Owner:
Christ Church Cathedral
Project Architect:
Woollen Molzan & Partners
Mechanical Engineer:
Rotz Engineers
Electrical Engineer:
Rotz Engineers
References:
Val Williamson
Junior Warden
Christ Church Cathedral
Larry
O’Connor
Wollen Molzan & Partners
(317) 632-7484
|
|
In
1989 Brandt Construction, Inc. served as Construction Manager/General
Contractor for the Christ Church Cathedral renovation project.
Exterior work included replacing the slate roof and terra cotta
cresting. Interior work included completely gutting the church
nave down to the stone walls. Then insulation, new plaster walls,
and ceilings were installed to improve acoustics in anticipation
of a new organ. Existing pews were dismantled, labeled, repaired,
refinished and reinstalled. Travertine floors were cleaned and
enhanced with inlays. Second floor renovations were completed
to upgrade administrative areas. All work was completed utilizing
a 20’ X 50’ staging/storage area along Meridian Street.
Features:
Upgrade
existing second floor and church to accommodate classrooms and
administrative space.
- Exterior improvements— new slate roof, terra cotta cresting.
- Nave restoration/renovation to accommodate new organ.
- Restoration of pews.
|
|
|
©