"Our mission is to produce quality construction, at an economical price, within a reasonable time frame. Customer satisfaction is our number one goal and is paramount to our continued success. We achieve this goal by employing highly trained managers and skilled tradesmen and by executing our work with the highest degree of professionalism and integrity."

 
Church of The Nativity—Project # 2

 

Completion Date:
December 1, 1998

Duration:
16 weeks

Work Performed by Brandt Construction, Inc.:
30%

Project Manager:
John Bauer

Owner:
Church of The Nativity

Project Architect:
Williamson Architects, Inc.

Structural Engineer:
Hoffman Consulting
Engineers

References:
Wayne Martin
Church of The Nativity
(317) 823-5362

Valentina Williamson
Williamson Architects, Inc.
(317) 263-9655

 

 

This is the second addition to the church that Brandt Construction, Inc. has performed. This addition consisted of a new narthex, kitchen, social bay and two new entrances. Due to the 45 degree placement of this addition, we were faced with multiple ceiling and roof slopes, from vaults to cathedrals to suspended. It all came together to provide a spacious and well defined facility that met the congregation’s needs. The laminated beams, the Ashlar stone exterior, and large window units make this addition appear as part of the original nave addition.

Features:

  • Finished floor surface is stained concrete which provides durability and color.
  • Well designed kitchen for all of the church’s social functions.
  • Multi-sloped roof structure which provides function and a “not so common” appearance.