Crossroads Rehabilitation Center |
Completion
Date:
September 1990
Duration:
9 months
Work Performed
by Brandt Construction, Inc.:
10%
Demolition, Concrete,
Rough & Finish
Carpentry
Project
Manager:
Todd Mattingly
Owner:
Crossroads Rehabilitation Center
Project Architect:
CSO Architects
Mechanical Engineer:
CSO Architects
Electrical Engineer:
CSO Architects
Civil Engineer:
CSO Architects
Structural Engineer:
CSO Architects
References:
Jim Vento
Crossroads Rehabilitation Center
(317) 466-2017
Les Olds
CSO Architects
(317) 848-7800
|
|
This
project was started in January of 1990. Shortly before the owner
took possession, vandals stole all the copper out of the building,
and a hard freeze caused extensive damage to the mechanical and
electrical systems. Therefore, the first task of this project
was to redesign and rebuild these systems from the ground up.
Also included in the work was re-roofing the building, and the
replacement of all exterior curtain wall glazing system. Once
the exterior was “dried in” and the mechanical systems
were repaired, finish work proceeded from the top down. The entire
five floor building was completely gutted and renovated in a 9
month time frame.
Features:
Project
included new mechanical systems and sprinkler system.
- New electrical service included a back up emergency generator
system.
- In light of the clientele, handicap accessibility was a critical
issue.
- A new drive through canopy was added to facilitate patient
drop off.
- Brandt Construction, Inc. built a handicap accessible playground
addition in 1991.
|
|
|
©