Crossroads Church at
Westfield |
|
Completion
Date:
November 2007
Duration:
8 Months
Work Performed
by Brandt Construction, Inc.:
25%
Project
Manager:
Meade Van Wyck
Superintendent:
Bill Wehrling
Owner:
Crossroads Church
Project Architect:
Arc Design
Structural Engineer:
Lynch, Harrison & Brumleve
Mechanical/Electrical
Engineer:
R.E. Dimond & Associates, Inc.
Civil
Engineer :
EMH&T
References:
Tom Goins
Crossroads Church at Westfield
(317) 417-5731
Michael Engledow
Arc Design
(317) 951-9192
|
|
In
March of 2007, Brandt Construction, Inc. was selected as the General
Contractor for the construction of the Crossroads Church at Westfield.
Work included extensive site preparation including lime stabilization
of parking and building pad, installation of city water main extension,
installation of city sewer and force main extension, and installation
of large retention pond. The building was steel and wood frame
construction with a pitched shingle roof and EPDM flat roof for
rooftop mechanical installation. The exterior finish was brick
and EIFS. The Sanctuary included a high vaulted ceiling with installation
of a stage and a sound booth. The entry gathering area featured
an exposed beam ceiling with multiple level suspended ceiling
"clouds". The building included three classrooms, a
small kitchen, and administrative offices.
Features:
- Exposed ceiling gathering area with multi-level suspended
ceiling
- Extensive audio visual coordination for stage lighting, sound
booth, and projection facilities
Click Here for
More Project Photos
|
| |
|
|
©