| |
|
Crown Hill Cemetery Waiting Station |
Completion
Date:
Fall 2001
Duration:
3 Phases over 3 years
Work Performed by Brandt Construction, Inc.:
30%
Project Manager:
Todd Mattingly
Owner:
Crown Hill Heritage Foundation
Project Architect:
Ratio Architects, Inc.
Mechanical Engineer:
Compton Mechanical Services,
Inc.
Electrical Engineer:
Barth Electric Co.
Civil Engineer:
Ratio Architects, Inc.
Structural Engineer:
Barth Electric Co.
References:
David Kroll
Ratio Architects, Inc.
(317) 633-4040
Keith Norwalk
Crown Hill Heritage Foundation (317) 925-8240
|
|
In
1997, Brandt Construction, Inc. was contracted to perform interior
renovation work as well as mechanical and electrical upgrades
to Crown Hill's Historic Waiting Station. Over the next
five years, we performed three separate phases culminating in
the total restoration of the waiting station. These phases
included masonry repair, roof repair, window restoration, and
interior finishes.
Features:
All
of exterior windows were fully restored, including original
wood slat window blinds, by Brandt Construction, Inc. craftsmen.
- New handicap ramps were added with new limestone facing to
complement the existing construction.
- The intricate tile pattern in the loggia was fully restored
with replacement tiles manufactured in England.
- Restoration included minor renovation to adapt space for present
office use.
|
|
|
©
2003 Brandt Construction, Inc. ° 330 East Saint Joseph Street
° Indianapolis, Indiana 46202
Telephone (317) 638-3300 ° Fax (317) 633-6671 |
|