Republic Services - Evendale
Transfer Station |
Completion
Date:
July 2007
Duration:
8 months
Work Performed
by Brandt Construction, Inc.:
15 %
Senior
Project Manager:
Jason Madden
Assistant Project Manager:
Jayde Steffen
Owner:
Republic Services of Ohio Hauling, LLC
Project Architect:
Shaw Environmental, Inc.
Mechanical/Electrical
Engineer:
R&W Engineering, Inc.
References:
Gregory Beamer
Republic Services, Inc.
(513) 326-7400
Peter
Lucas
Cornerstone Environmental Group, LLC
(937) 746-0657
David Miller
Weaver Boos Consultants, LLC
(614) 487-1066
|
|

Construction of the 23,000 square foot Transfer Station began
in August of 2006. The existing buildings and site were razed
prior to the new construction. The pre-engineered building was
erected on cast-in-place concrete foundations. The project also
included massive concrete push and retaining walls and 13"
thick floor slabs. The facility was designed and constructed to
be Republic's most technologically advanced Transfer Station to
date. It was completed in July 2007.
Features:
- Partial depth drive through loading tunnel
- Leachate System - to contain/collect all fluids from
within the building in an above ground storage tank separate
from all storm and sanitary systems.
- 15,800 square foot tipping floor
- Full fire sprinkler system
- Negative pressure exhaust system
- Odor control system
- Platform and axle scales
- Large drive through tarping station
- Scale House office building
Click Here for More Project Photos
|
|
|
©