"Our mission is to produce quality construction, at an economical price, within a reasonable time frame. Customer satisfaction is our number one goal and is paramount to our continued success. We achieve this goal by employing highly trained managers and skilled tradesmen and by executing our work with the highest degree of professionalism and integrity."

 
Roosevelt Middle School

 

Completion Date:
December 2008

Duration:
5 Months

Work Performed by Brandt Construction, Inc.: 
20 %

Owner:
Twin Lakes School Corporation

Project Architect:
InterDesign

Mechanical Engineer:
Stair Associates, Inc

Civil Engineer:
Driesenga & Associates, Inc.

References:
Dr. Thomas Fletcher
(574) 583-7211

Joe Uhlenhake
(317) 263-9655

 

Brandt Construction, Inc. began the construction of a Transportation Building and cafeteria addition for the Roosevelt Middle School in early July of 2008. The growing number of students needing cafeteria services prompted the 3,600 square foot expansion. The addition consisted of a concrete building pad, structural steel framing, EPDM roofing, exterior brick finish and EIFS to match the existing building, interior masonry block walls with vaulted tile ceilings, and VCT flooring. The Transportation Building was in need of an extra room as well, and a 3,900 square feet pre-engineered metal building was added as well as an expanded bus parking area.

Features:

  • Cafeteria Addition - 3,600 Square Feet
  • Transportation Building Addition - 3,900 Square Feet
    Four-Post Bus Lift for Bus Servicing and Maintenance
  • Site Improvement
  • Bus Parking Area Expansion

     