Completion
Date:
January
1998
Duration:
10 months
Work Performed by Brandt Construction, Inc.:
15%
Project Manager:
Harold Sattison
Owner:
Roman Catholic
Archdiocese of Indianapolis
Project Architect:
C.R. Stafford & Associates
Mechanical
Engineer:
John Oberlies Consulting Engineers,
Inc.
Civil Engineer:
John Oberlies Consulting Engineers,
Inc.
Structural
Engineer:
Lynch, Harrison, Brumleve
References:
Father Gerry Kirkoff
(317) 786-4371
Dick Stafford
(317) 630-1871 |
|
The
project included a partial renovation of the existing school,
a 1,700 square foot new addition, a 19,000 square foot new sanctuary
and a 12,750 square foot new multi-purpose building. Brandt Construction
was awarded the project in Fall of 1996. Phased construction started
in February 1997 and was completed in January 1998. Coordination
of security and staging areas were critical to assure the safe
delivery and pickup of students.
Features:
Sanctuary
structure is comprised of laminated arches and wood deck with
exterior masonry walls.
- Interior sanctuary finishes include wood deck ceiling, colored
split face block walls and carpeted floors. Exterior finishes
are brick with shingle roof.
- Pre-engineered multi-purpose building includes colored split
face masonry to 12’ height.
- Metal panels to the eave and metal roof maintain a cost effective
gymnasium.
- Nave seats 800 with 7,000 square feet of a support area.
- Project was phased and competed while school was in session.
|
| |
|
|
©