Arsenal Tech High School
Tunnels |
Completion
Date:
September 1990
Duration:
5 months
Work Performed
by Brandt Construction, Inc.:
40%
Demolition, Concrete,
Miscellaneous
Project Manager:
Todd Mattingly
Owner:
Indianapolis Public Schools
Construction Manager:
The Skillman Corporation
Mechanical Engineer:
Rotz Engineers
Electrical Engineer:
Rotz Engineers
Civil Engineer:
HNTB
Structural Engineer:
HNTB
Reference:
Jim Hopp
The Skillman Corporation
(317) 783-6151
|
|
This
project called for the demolition and the replacement of 90 linear
feet and the repair of 630 linear feet of utility tunnel on the
Tech High School campus. All work had to be completed while many
of the services remained intact. The work also included associated
hardscaping and landscaping disturbed areas upon completion.
Features:
- Brandt Construction, Inc. designed and built temporary bracing
systems that allowed utility repair work to happen simultaneously.
- All work was completed on schedule before the start of fall
classes.
- New tunnel construction required relocation and coordination
of access roads with maintenance staff.
|
|
|
©