Ben Davis Christian Church |
Completion
Date:
November 1999
Duration:
1 year
Work Performed
by Brandt Construction, Inc.:
32%
Project Manager:
Chirag Patel
Owner:
Ben Davis Christian Church
Project Architect:
BSA Design
Mechanical Engineer:
BSA Design
Electrical Engineer:
BSA Design
Civil Engineer:
BSA Design
Structural Engineer:
BSA Design
References:
Gene Conway
Ben Davis Christian Church
(317)241- 3644
Andy Hine
ARC Design
(317) 951-9192
Kalevi Huotilainen
BSA Design
(317)819-7878
|
|
In
February of 1998, Brandt Construction, Inc. was hired as a general
contractor to help assist in the design phase and the construction
of a 22,400 square foot addition to the existing church. The addition
is comprised of a new gathering area, a basement, a sanctuary,
a stage, a choir room, classrooms, offices, and a parlor, as well
as site development. The structure consisted of concrete foundation
walls, structural steel and wood framing, exterior brick, and
a shingle roof. This project started in November, 1998 and was
completed in November, 1999. Challenges included drainage permit
delays and winter foundation installation. Old field tiles drained
water into the new basement excavation. These difficulties were
overcome by the persistence of the Brandt team. Spring finally
arrived and construction proceeded normally.
Features:
- Structure made of concrete walls, structural steel and wood
framing, exterior brick, and shingle roof.
Winter
foundation work.
- Underground duct system for heat.
|
|
|
©