Ben Davis Christian Church Activity
Center
and Kitchen Addition
|
Completion
Date:
June 2004
Duration:
1 year
Work Performed
by Brandt Construction, Inc.:
30%
Project Manager:
John Boyle
Owner:
Ben Davis Christian Church
Project Architect:
red Architecture
Mechanical Engineer:
Rotz Engineering
Civil Engineer:
Trehorst, Lamson & Fisk
Structural Engineer:
Alberts Engineering
References:
Jeff Stone
red Architecture
(317)269-0940
Andy Hine
ARC Design
(317) 951-9192
|
|
After
building a new sanctuary for Ben Davis Christian Church in 1998,
Brandt Construction was again selected to construct an addition
to the building in 2002. The 16,000 square foot addition
consisted of a new activity center which houses offices, classrooms,
a gymnasium and a kitchen. Construction began in the summer
of 2003 and was completed in June of 2004.
Features:
- Precast concrete walls with brick design.

- Synthetic basketball flooring.
- Dual lighting system in gym.
|
|
|
©
2003 Brandt Construction, Inc. ° 330 East Saint Joseph Street
° Indianapolis, Indiana 46202
Telephone (317) 638-3300 ° Fax (317) 633-6671 |
|