Completion
Date:
August 1999
Duration:
10 months
Work Performed
by Brandt Construction, Inc.:
30%
Project
Manager:
Harold Sattison
Owner:
Bethel African Methodist Episcopal Church
Project Architect:
AIC Architects
Mechanical Engineer:
John Oberlies Consulting Engineering,
Inc.
Electrical Engineer:
John Oberlies Consulting Engineering,
Inc.
References:
Dr. Robert E. Brumfield, Sr. Pastor
Bethel AME Church
(317) 714-4503
John Oberlies
John Oberlies Consulting Engineering, Inc.
(317) 636-3941
|
|
On
May 28, 1999, Brandt Construction, Inc. was awarded a contract
from Bethel African Methodist Episcopal Church (Bethel AME). The
contract scope included complete renovation of the 103 year old
sanctuary, narthex, restroom facilities, kitchen, and Pastor’s
offices. Brandt Construction, Inc. fabricated and installed forty-seven
(47) newel posts and four hundred (400) intricately detailed balusters
which make up the balcony railings, altar railings, and choir
railing. These pieces were detailed and fabricated from original
pictures of the church. Because local mills would not guarantee
completion by August 10, Brandt Construction, Inc. accepted the
challenge with their own skilled craftsman.
Features:
- All work had to be completed in 10 weeks to allow the church
to have a previously scheduled church service on August 15,
1999 for over 1000 people.
- 30% of the contract involved work by Brandt's carpenters.
- With stock material from various suppliers, Brandt’s
carpenters milled, lathed, scrolled, assembled and installed
all railings.
|
|
|
©