Christ Church Cathedral
— 1999 New Elevator |
Completion
Date:
March 2000
Duration:
9 Months
Work
Performed by Brandt Construction, Inc.: 60%
Project Manager:
Harold Sattison
Owner:
Christ Church Cathedral
Project Architect:
Williamson Architects, Inc.
Mechanical
Engineer:
Rotz Engineers
Structural
Engineer:
Ter Horst Lamson & Fisk, Inc.
References:
Rees Olander
Christ Church Cathedral
(317) 636-4577
Val Williamson
Williamson Architects
|
|
In the fall of 1995, Brandt Construction, Inc.
was called by Christ Church Cathedral to begin their fifth project
together. The landmark church on the circle needed an elevator.
After 3 years of discussions, planning, reviewing and costing
out different possibilities, construction documents were completed
and construction began in June of 1999. Construction involved
a phased project which included office, nursery, classroom, library
and conference room relocations. Church activities and worship
services were to be maintained during construction. Unique components
of the construction included demolition and excavation of the
fellowship hall concrete stage and flooring for the elevator pit.
Foundation underpinning and new steel beams and columns were added
for structural support. All materials were removed and provided
by way of a 3’ X 7’ door to the back alley. The basement
demolition resembled a mining operation with push carts and electric
hoist to the street level where materials were loaded into dumpsters.
Existing building structural modifications were made at each floor
to accommodate the elevator hoist and new stairs. Primary mechanical
and electrical systems were relocated to facilitate new construction.
Finally new high level finishes were installed throughout the
church including oak doors, trim and cabinetry.
Features:
- Demolition and excavation of concrete stage
and flooring for elevator pit.
- Foundation underpinning and new steel beams
and columns.
- Basement demolition done by way of “mining
operation" with push cars and electric hoist.
- Office, nursery, classroom, library and conference
room relocations.
- Building of Nativity and annual tear down
and erection of Nativity.
|
|
|
©